STRATEGIC PARTNER FOR TUNNEL PROJECTS
Below are examples of the projects with TBM machines that we produce and refurbished.

Tunus-Rades C-Combined Cycle
Power Plant – TUNISIA
Length: 129m, 135m twin tunnels
Our team has succesfully connected cooling water pool with Mediterraneansea, using a OD Ø2400 Slurrytype MTBM in 28 days total, in March 2019

Gastrans Transmission Gas Pipeline, Morava River Passing 1 – SERBIA
Length: 610m
Our team has succesfully completed passing under Morava river, using a OD Ø1300 Slurry type MTBM with DPI Method in 18 days, in February 2020

MERSIN PAMUKLUK PROJECT
Length: 4.716m
Tunnel Usage: Barrage Water Conveyance

CYPRUS, GÜZELYURT AND MESERYA PLAINS IRRIGATION STRUCTURES PROJECT
Length: 5.700m