STRATEGIC PARTNER FOR TUNNEL PROJECTS

Below are examples of the projects with TBM machines that we produce and refurbished.

Mahmutbey Bahçeşehir Esenyurt Metro Project

Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

: IC İçtaş İnşaat Sanayi ve Ticaret AŞ

: TBM operation between Mahmutbey-Temapark Station

: 8.944 m (Double Line total)

: 2

: 6570 mm

: 1,50 m

: 6300 mm

: 5700 mm

: 01.11.2021

: 01.06.2022

: On- going – February/2024

: Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.

Bakırköy-Kirazlı Metro Project

Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

:AGA Enerji Nak. Mad. İnş. San. Ve Tic.A.Ş.

:TBM operation between İncirli-Kirazlı

:6.975 m (Double Line total)

:2

:6570 mm

:1,50 m

:6300 mm

:5700 mm

:16.10.2020

:16.11.2020

:05.05.2022         

:Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.

Başakşehir – Kayaşehir Metro Project

Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

:ŞENBAY – ÖZGÜN – SÖĞÜT Joint Venture

:TBM operation between Kayaşehir- Başakşehir

:3.298 m (Double Line total)

:2

:6570 mm

:1,50 m

:6300 mm

:5700 mm

:02.06.2020

:25.08.2020

:March/2021

:Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.

Halkalı – Istanbul Airport Metro Project

Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

Yedigöze İnş.Dan.Otom. İç.ve Dış Tic. Ltd.Şti.

TBM operation between Olimpiyatköy – Fenertepe

15.176 m (Double Line total)

2

6570 mm

1,50 m

6300 mm

5700 mm

13.04.2019

20.12.2019

25.01.2022

The Excavation Work was planned in two phases, and firstly, 7,380 meters of excavation started from the M12 Truss Shaft near Kayaşehir in the direction of Olimpiyatköy, and the excavation work of this section was completed in November 2020.The TBMs, which were disassembled from Olimpiyatköy, were reassembled on the M12 Truss Shaft and the excavation works in the Fenertepe direction started in January 2021. Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.

Tunisia Rades Combined Cycle Power Plant Project Cooling Tunnel

Main Contractor

Scope of E-BERK

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

Gama Holding

COMBINED CYCLE POWER PLANT PROJECT

COOLING TUNNEL

231 m

1 MTBM

2435mm

3000mm

2400mm

2000mm

22.06.2018

18.10.2018

27.03.2019

In order to connect the cooling water of the natural gas conversion facility in Tunisia Rades region, 2 tunnels are the work of excavation and pipe driving with a 240-meter in total with an E-BERK MTBM machine.

Kocaeli Karamürsel Water Transmıssıon Tunnel

The Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Starting Date

Completion Date

Scope of Özsöz

Arhat & Medsan Karamürsel Joint Venture

Water transmission tunnel line

2.768 m

 1

3250 mm

1.0 m

3000 mm

2600 mm

11.05.2022

23.07.2022

On-going – December, 2023

The project consists of Karamürsel Water Transmission Tunnel in Kocaeli province in Turkey. The tunnel will be excavated by TBM that consisting of length of 2768 m. Single Shield EPB type TBM will be used which one was designed and supplied by E-BERK.The scope of Özsöz is an excavation with the TBM, Tunnel Segment Production and Completion of the Injection Works.

Adıyaman Koçali Irrigation Channel and Tunnel Project

Main Contractor

Scope of Özsöz

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Estimated Completion Date

Scope of Özsöz

Kormak İnşaat Malzemeleri Sanayi ve Tic. A.Ş.

Koçali Irrigation TBM TUNNEL PROJECT

5.194 m

1            

4980 mm

1,50 m 

4800 mm

4200 mm

01.02.2021

01.12.2021

March, 2023

Provision of TBM and Backup Units. Excavation with the TBM Provided by the Employer, Assembly of the Produced Segments and Completion of the Injection Works.

Ergene Deep Discharge Waste Water Transmission Tunnel Project

Main Contractor

Scope of E-BERK

Tunnel A Line 1 Length

Tunnel A Line 2 Length

Tunnel A Line B Length

Number of TBM

Excavation Diameter for Tunnel A Line 1

Diameter after Second Lining for Tunnel A Line 1

Segment Length Tunnel A Line 1

Segment Outer Diameter Tunnel A Line 1

Segment Inner Diameter Tunnel A Line 1

Excavation Diameter for Tunnel A Line 2

Diameter after Second Lining for Tunnel A Line 2

Segment Length Tunnel A Line 2

Segment Outer Diameter Tunnel A Line 2

Segment Inner Diameter Tunnel A Line 2

Excavation Diameter for Tunnel B

Diameter after Second Lining for Tunnel B

Segment Length Tunnel B

Segment Outer Diameter B

Segment Inner Diameter B

Contract Date for Tunnel A&B Lines

Start Date for Tunnel

Completion Date for Tunnel A

Start Date for Tunnel B

Completion Date for Tunnel B

Scope of E-BERK

ÖZGÜN Yapı ve Sanayi Ticaret aş.

Waste Water Transmission Tunnel Project. E-Berk’s manufactured “Anadolu“ and “Lale” TBMs, were used at Ergene Deep Discharge Waste Water Tunnel Constuction Project for Tunnel A Line and Tunnel B Line.

3600 m

6383 m

9923 m

3

3850 mm

2800 mm

1,20

3600 mm

3200 mm

3250 mm

2000 mm

1000 mm

3000 mm

2600 mm

3250 mm

2000 mm

1000 m

3000 mm

2600 mm

03.07.2015

05.01.2016

15.04.2021

08.11.2016

15.12.2021

Tunnel construction and segment coating work with Anadolu TBM and Lale TBM with an inner diameter of 2000 mm.

Güzelyurt and Meserya Cyprus Plain Irrigation Transmission Tunnel

Main Contractor

Scope of ÖZSÖZ

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Starting Date

Scope of Özsöz

Makyol İnşaat Sanayi Turizm ve Ticaret Aş.

Irrigation Transmission Tunnel

5700 m

1

4800 mm

1500 mm

4600 mm

400 mm

15.01.2018

12.04.2018

Tunnel excavation with tunnel segment production and segment covering, and supervision and consulting services.

Mersin Pamukluk Dam Irrigation Transmission Tunnel

Main Contractor

Scope of E-BERK

Line Length

Number of TBM

Excavation Diameter

Segment Length

Segment Outer Diameter

Segment Inner Diameter

Contract Date

Start Date

Completion Date

Scope of Özsöz

İNELSAN İnş. Elekt . San. ve Tic. A. Ş.

IRRIGATION TRANSMISSION TUNNEL

4618 m

1

4980 mm

1500 mm

4800 mm

4200 mm

25.01.2016

29.05.2016

04.01.2018

Excavation with the TBM Provided by E-BERK, Assembly of the Produced Segments and Completion of the Injection Works.